View the attestation results (‘Yes’/’No’) for each individual Domain element in the table to the right of the Attestation Submitted column to determine whether the facility indicated they have completed each of the elements in the Domain. To receive full points for the ESRD QIP FCHE reporting measure, each column must indicate ‘Yes.’
In addition to the Facility CCN, Facility State, and Attestation Submitted status, the Facility Summary table displays the annual reporting period (Time Period), responses to each individual element of a Domain, with the Domain specified after the element in parentheses, Network, EDI Name, EDI Facility ID, and Facility ID (Figure 12).
Figure 12 – Facility Summary Attestation Details
|